national emblem

राष्ट्रीय एड्स नियंत्रण संगठनNational Aids Control Organisation

NACO Update
Home >> NACP >> National AIDS Control Programme IV >> National AIDS Control Programme IV

National AIDS Control Programme IV

Error message

  • Warning: include_once(): Unable to allocate memory for pool. in drupal_settings_initialize() (line 732 of /home2/cmf/docs/includes/bootstrap.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in _drupal_bootstrap_page_cache() (line 2630 of /home2/cmf/docs/includes/bootstrap.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in _drupal_bootstrap_page_cache() (line 2632 of /home2/cmf/docs/includes/bootstrap.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in require_once() (line 11 of /home2/cmf/docs/sites/all/modules/contributed/memcache_storage/memcache_storage.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in _drupal_bootstrap_database() (line 2720 of /home2/cmf/docs/includes/bootstrap.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in _drupal_bootstrap_variables() (line 2740 of /home2/cmf/docs/includes/bootstrap.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in Database::openConnection() (line 1721 of /home2/cmf/docs/includes/database/database.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in Database::loadDriverFile() (line 1810 of /home2/cmf/docs/includes/database/database.inc).
  • Warning: require_once(): Unable to allocate memory for pool. in Database::loadDriverFile() (line 1810 of /home2/cmf/docs/includes/database/database.inc).
National AIDS Control Programme IV
S,No. Title Attachment
1 Gist of the deliberations of the meeting of Working Group on AIDS control by Planning Commission Download(41.4 KB)NACP IV
2 Planning Process
(A Summary of the planning process for NACP -IV)
Click here
3 Working Groups
(includes list of working group members, presentations & documents from different rounds of consultations)
Click here
4 Schedule
(Dates and locations for working group Consultations)
Click here
5 An Update – 15, July 2011
(Regular Updates on NACP-IV from NACO)
Click here
6 An Update – 14, July 2011
(Regular Updates on NACP-IV from NACO)
Download(77.3 KB)NACP IV
7 An Update – 8, July 2011
(Regular Updates on NACP-IV from NACO)
Click here
8 An Update – 15, June 2011
(Regular Updates on NACP-IV from NACO)
Click here